Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 免费无码婬片AAAA片直播 | 色欲狠狠躁天天躁无码中文字幕 | 91丨九色丨农村老熟女按摩 | 120分钟婬片免费看 免费在线观看AV | 午夜在线观看视频 | 韩国无码在线观看 | 少妇伦伦伦一区二区三区 | A片试看120分钟做受视频红杏 | 精品在线观看视频 | 日产国产亚洲A片无 码 | 蜜乳av国精产品一二三产区 | 91在线无码精品秘 蜜桃原神 | yw尤物AV无码国产在线观看 | 精品国产又粗又大又黄又硬 | 一级毛片a一级毛片免费看黄道婆 | 苍井空做爰高潮A片久久直播 | 欧美一区二区三区成人久久片 | 又粗又大又黄的视频 | 国产亚洲精品久久久久四川人 | 亚洲成人中文字幕 | 在线成人中文字幕 | 欧美日韩国产精品 | 少妇与大狼拘作爱性A片 | ,四川少妇搡BBBB搡BBBB | 日韩精品 一区二区三区 | 亚洲欧美另类在线 | 国产寡妇婬乱A毛片视频中文 | 疯狂 自慰爽www看片麻豆 | 强行糟蹋人妻中文字幕 | 亚洲无码福利视频 | 无码精品人妻一区二区湖北九色 | 精品国产一区二区三区久久久 | 精品人妻无码一区三区蜜桃 | 亚洲AV无码高潮 | 视频一区二区在线观看 | 免费黄片视频大全 | 寡妇高潮一级毛片免费看大胸 | 欧美最猛黑A片黑人猛交蜜桃视频 | 亚洲无码一区二区三区 | 成人羞羞视频在线观看网站 |